Full bathroom remodel and new suite fitted – Room space stripped back, ceiling and plasterboard walls taken off, floor taken up and reinforced with steel flitch plates, new plumbing and electrics concealed in the room shell – including under floor heating and alcove down-lighters, timber studs modified to create alcoves, new plasterboard ceiling and walls put up, whole shell re-plastered, tiling of floor and walls, 140kg bath put in situ, walk in shower/ toilet/ vanity unit with double sink/ heated towel rail/ large mirrored cupboard with hidden shaver dock fitted.

14067831_1500784359947489_7110386595286599358_o          14067941_1500784159947509_483663814764768225_o          14067761_1500784029947522_1089744109543005604_o          14207769_1525938124098779_6733139736574720895_o

slider-2

Project Details

Category: Bathrooms, Renovations